The Selections Guide: What to Decide, and When

The decisions in the right order, so none of them is rushed.

A custom home has hundreds of decisions. Made in the right order, they are enjoyable. Made late, they cost time and money. We work from a room-by-room selections workbook that lists every choice, the phase it is due in, and its budget.

First: what shapes the drawings

Kitchen and bath layouts, window sizes and locations, fireplaces, stairs, ceiling heights and built-ins. These change the plans, so they are decided during design.

Next: the big finishes

Cabinetry, stone, tile, flooring, interior doors and trim, and appliances. These are priced into the working budget, so you can see what each choice costs while design is still open. Appliances come early because the cabinetry is built around them.

Then: lock it before permits

Selections typically take two to three months, alongside design, and are locked before permits. That is what lets us give you a detailed line-item budget and a schedule you can rely on.

Allowances: only two

We keep allowances to light fixtures and plumbing fixtures. Everything else is chosen and priced before your contract, so the budget describes the house you chose.

Last: what can wait

Paint colors and some decorative pieces can be finalized later in construction. Paint is tested on the walls once the drywall is up.

Room by room

For each room: flooring, wall and ceiling finish, lighting, cabinetry or built-ins, hardware, and fixtures.

  • Foyer and entry
  • Kitchen, pantry and back kitchen
  • Great room and dining
  • Mudroom and laundry
  • Primary suite and closet
  • Baths and powder room
  • Office or study
  • Lower level, wet bar and bunk rooms
  • Stairs and halls
  • Porch, garage and storage

Get the process guide

Frequently asked questions

What happens if we change our minds?

A change is written, priced and signed before the work moves, so you always know what it costs and what it moves.

Who helps us choose?

We guide every selection with a recommendation and the reasons for it, not a wall of samples.

How long do selections take?

Typically two to three months, alongside design, locked before permits.